Multi-Engine Piston
1984 BOEING 767-200
Call for price
fyiEstimate
$291,000–$298,500
ⓘ
How this estimate is built
Starts from the median asking price of 851 comparable Multi-Engine Piston listings ($395,000), then adjusts for:
- Year +4 vs comparable listings +6.0%
- Airframe time +59,828 hr vs comps -20.0%
- Engine time +79,169 hr vs comps -12.0%
Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.
1984
64,604 hrs
—
—
GE
2
—
—
Overview
| Make / Model | BOEING 767-200 |
|---|---|
| Type | Multi-Engine Piston |
| Airframe time | 64,604 hrs |
| Engine time | 80,024 SNEW |
| Avionics / flight deck | ROCKWELL COLLINS |
| Airworthy | Yes |
Description
Landing Gears due June 2030 THIS IS ONE OF THREE AND ALL ARE SISTER SHIPS AND PRICE IS SAME FOR EACH OF THE THREE. STORED IN DRY USA CENTRAL LOCATION FOR INSPECTIONS.
Modifications
EADI EFIS DISPLAY L/R, IRU,FMC, TCASII, TCAS II
General
| Year | 1984 |
|---|---|
| Manufacturer | BOEING |
| Model | 767-200 |
| Condition | Used |
| FlightRules | IFR |
Airframe
| Total Time | 64,604 |
|---|---|
| Total Landings | 45,743 |
| Max Ramp Weight | 312,000 lb |
| Max Takeoff Weight | 310,000 lb |
| Max Landing Weight | 272,000 lb |
| Max Zero Fuel Weight | 253,000 lb |
Engine 1
| Engine 1 Make/Model | GE |
|---|---|
| Engine 1 Time | 80,024 SNEW |
| Engine 1 Cycles | 17,741 |
| Engine 1 On Condition | Yes |
Engine 2
| Engine 2 Make/Model | GE |
|---|---|
| Engine 2 Time | 57,198 SNEW |
| Engine 2 Cycles | 38,239 |
| Engine 2 On Condition | Yes |
Avionics
| Flight Deck Manufacturer/Model | ROCKWELL COLLINS |
|---|
Additional Equipment
| Additional Equipment | EADI EFIS DISPLAY L/R, IRU,FMC, TCASII, TCAS II |
|---|
Interior
| Galley Configuration | Forward |
|---|
Inspection Status
| Inspection Status | FRESH 4C/D check @ 6 years |
|---|---|
| Airworthy | Yes |
Auxiliary Power Unit
| APU | Yes |
|---|---|
| APU Maintenance Program | None |
Engine Program
| Engine Maintenance Program | None |
|---|