‹ Back to results
Multi-Engine Piston

1978 CESSNA 421C

$549,000 fyiEstimate $432,500–$443,500 How this estimate is built

Starts from the median asking price of 56 comparable CESSNA 421C listings ($449,950), then adjusts for:

  • Year -1 vs comparable listings -1.5%
  • Airframe time -1,004 hr vs comps +2.0%
  • Engine time +339 hr vs comps -1.0%
  • Garmin G600 glass (uncommon in comps) +3.0%
  • Market supply: 69 for sale of 497 FAA-registered -5.0%

Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.

1978
5,231 hrs
N21SS
421C0473
CONTINENTAL IO520L
2
HARTZELL
SGH
Midwest Corporate Air
📍 Bellefontaine, Ohio
Midwest Corporate Air INC Co-owned
Per the FAA aircraft registry (public record)
📍 Bellefontaine, OH

Overview

Make / ModelCESSNA 421C
TypeMulti-Engine Piston
Airframe time5,231 hrs
Engine time1,098 SMOH
Avionics / TransponderGarmin GTX 345R
Avionics / OtherGarmin GFC 600, L3 ESI-500, Garmin G600
ADS-BYes
AnnualAug 2025
InspectionAnnual
Garmin GPS Autopilot ADS-B

Description

1978 Cessna 421C Golden Eagle — Garmin G600, GFC 600 Autopilot, GWX 75 Radar, RAM Right Engine 231 SMOH — $549,000 Most 421Cs for sale have the same story: mid-time engines, a legacy autopilot, and a 530/430 stack that was modern in 2005. N21SS is not that airplane. The panel was rebuilt around a Garmin G600 primary flight display, a Garmin GFC 600 digital autopilot installed in January 2024, and a Garmin GWX 75 color weather radar — also installed January 2024. This is the avionics package that makes single-pilot IFR in a pressurized twin genuinely manageable: a glass primary display, a modern digital autopilot with envelope protection, and onboard radar that does not require a second pilot to interpret. The GTX345R handles ADS-B In and Out. An L3 ESI-500 electric standby covers the panel if the G600 ever needs attention. A JPI EDM760-6C monitors all six cylinders on both engines simultaneously. The mechanical story is equally strong. The right engine — Continental GTSIO-520-L, S/N 246026R — was overhauled by RAM Aircraft in Waco, Texas to New Parts Limits in May 2020, with a new CMI heavy-style crankcase, new CMI nickel cylinders, new RAM camshaft, and new lifters. It has approximately 231 hours since that overhaul. The left engine, S/N 239244-4, shows approximately 1,098 hours since major overhaul, with recent top-end work including an overhauled #3 cylinder completed in March 2024 using new Continental parts. Both Hartzell HC-C3YN-2UF three-blade propellers were installed new in February 2004 and have approximately 1,553 hours since new — well inside Hartzell's 2,400-hour TBO. The maintenance posture is what serious 421C buyers want to see before they pick up the phone. The most recent annual inspection was completed August 7, 2025 by Midwest Corporate Air in Bellefontaine, Ohio (Tim Kerns, A&P/IA). New Goodyear tires were installed on all three positions, a new Concorde RG24-20 main battery was installed, and new RAM exhaust risers with all-new gaskets and hardware were fitted to the left engine. IFR certification was completed March 21, 2026 by Achievement Aviation of Ohio, confirming the G600, GTX345R, and L3 ESI-500 to 35,000 feet. The landing gear system underwent a complete overhaul in November 2022. The A/C compressor was overhauled in May 2024. The left hydraulic pump was overhauled in December 2025. Whelen Orion 650 LED position and strobe lights were installed in September 2025. The oxygen system is current with hydrostatic testing due March 2029. Complete and continuous logbooks are included — airframe, both engines, and both propellers — with no known major damage history. The cabin is configured in an executive club arrangement with a center table. Air conditioning, oxygen, and Shadin fuel flow are all installed and operational. This is a pressurized, IFR-equipped, glass-panel 421C with a fresh right engine and a modern autopilot. Serious inquiries only. Logbooks and maintenance records available for review prior to inspection.

Modifications

Air Conditioning: Installed | Compressor overhauled May 2024 Oxygen: Installed | Hydrostatic due March 2029 Fuel Flow: Shadin Fuel Flow System

Avionics

Garmin G600 | S/N 3M5002075 Garmin GFC 600 Digital | Installed January 2024 | STC SA01844WI Garmin GWX 75 Color | Installed January 2024 Garmin GTX345R | ADS-B In/Out | S/N 3EH023797 L3 ESI-500 Electric Standby | S/N 2412 JPI EDM760-6C | S/N 6610 | STC SA00729SE Whelen Orion 650 LED Position/Strobe | Installed September 2025

How this aircraft compares

Where this CESSNA 421C lands versus other CESSNA 421C listings on fyiAero.

Price

82nd pct
$197k$749kThis aircraft · $549k

$549k · 82nd percentile of 56 listings

Airframe time

33rd pct
2,53911,582This aircraft · 5,231

5,231 hours total (TTAF) · 33rd percentile of 70 listings

Engine time (Engine 1)

74th pct
11,680This aircraft · 1,098

1,098 hours since major overhaul · 74th percentile of 68 listings

Engine time (Engine 2)

22nd pct
11,675This aircraft · 231

231 hours since major overhaul · 22nd percentile of 68 listings

Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.

General

Year1978
ManufacturerCESSNA
Model421C
Serial Number421C0473
Registration #N21SS
ConditionUsed
FlightRulesIFR
Based atSGH

Airframe

Total Time5,231

Engine 1

Engine 1 Make/ModelCONTINENTAL IO520L
Engine 1 Serial Number239244-4
Engine 1 Time1,098 SMOH
Engine 1 TBO1600

Engine 2

Engine 2 Make/ModelCONTINENTAL IO520L
Engine 2 Serial Number246026R
Engine 2 Time231 SMOH
Engine 2 TBO1600

Props

Prop 1 ManufacturerHARTZELL
Prop 1 ModelHC-C3YN-2LUF
Prop 1 Time1553 SNEW
Prop 2 ManufacturerHARTZELL
Prop 2 ModelHC-C3YN-2LUF
Prop 2 Time1552 SNEW

Avionics

ADS-B EquippedYes
Avionics/RadiosGarmin G600 | S/N 3M5002075 Garmin GFC 600 Digital | Installed January 2024 | STC SA01844WI Garmin GWX 75 Color | Installed January 2024 Garmin GTX345R | ADS-B In/Out | S/N 3EH023797 L3 ESI-500 Electric Standby | S/N 2412 JPI EDM760-6C | S/N 6610 | STC SA00729SE Whelen Orion 650 LED Position/Strobe | Installed September 2025

Additional Equipment

Oxygen SystemYes
A/CYes
Additional EquipmentAir Conditioning: Installed | Compressor overhauled May 2024 Oxygen: Installed | Hydrostatic due March 2029 Fuel Flow: Shadin Fuel Flow System

Inspection Status

Inspection StatusComplete Gear Overhaul- Nov. 2022 Complete Annual- Aug 2025

Brochure

Brochurebrochure.pdf