1995 LEARJET 31A
Starts from the median asking price of 8 comparable LEARJET 31A listings ($722,500), then adjusts for:
- Year +2 vs comparable listings +3.0%
- Airframe time +3,445 hr vs comps -6.9%
- Engine time +6,259 hr vs comps -12.0%
- Autopilot (uncommon in comps) +2.0%
Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.
Overview
| Make / Model | LEARJET 31A |
|---|---|
| Type | Multi-Engine Piston |
| Airframe time | 9,757 hrs |
| Engine time | 10,740 |
| Annual | August 2025 |
| Inspection | Phase |
Description
Engines Enrolled on JSSI New Paint 2024 Leather Refurbishment 2024 New Tires 2024 Delivered Fresh from Phases A, B and C Inspections
Modifications
ADS-B OUT, Universal FMS, FDR
Avionics
The Bombardier Learjet 31A is equipped with an integrated, Bendix/King KFC3100 avionics suite.
How this aircraft compares
Where this LEARJET 31A lands versus other LEARJET 31A listings on fyiAero.
Airframe time
94th pct9,757 hours total (TTAF) · 94th percentile of 18 listings
Engine time (Engine 1)
99th pct10,740 engine hours · 99th percentile of 18 listings
Engine time (Engine 2)
99th pct10,567 engine hours · 99th percentile of 18 listings
Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.
General
| Year | 1995 |
|---|---|
| Manufacturer | LEARJET |
| Model | 31A |
| Serial Number | 095 |
| Condition | Used |
Airframe
| Total Time | 9,757 |
|---|---|
| Total Landings | 8,667 |
Engine 1
| Engine 1 Serial Number | P-99275C |
|---|---|
| Engine 1 Time | 10,740 |
| Engine 1 Cycles | 8,822 |
Engine 2
| Engine 2 Serial Number | P-99276C |
|---|---|
| Engine 2 Time | 10,567 |
| Engine 2 Cycles | 8.7 |
Avionics
| Avionics/Radios | The Bombardier Learjet 31A is equipped with an integrated, Bendix/King KFC3100 avionics suite. |
|---|
Additional Equipment
| Additional Equipment | ADS-B OUT, Universal FMS, FDR |
|---|
Inspection Status
| Inspection Status | Inspection Last Performed Next Due Phase A August 2025 August 2026 Phase B September 2024 September 2025 Phase C September 2021 September 2025 Phase D September 2021 September 2029 |
|---|
Engine Program
| Engine Maintenance Program | JSSI |
|---|