2011 BOMBARDIER CHALLENGER 300
Starts from the median asking price of 4 comparable BOMBARDIER CHALLENGER 300 listings ($9,622,500), then adjusts for:
- Year +4 vs comparable listings +6.8%
- Airframe time +84 hr vs comps -0.2%
- Engine time -444 hr vs comps +1.3%
Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.
Overview
| Make / Model | BOMBARDIER CHALLENGER 300 |
|---|---|
| Type | Multi-Engine Piston |
| Airframe time | 5,963 hrs |
| Engine time | 5,756 SNEW |
| Annual | Apr 2027 |
Description
Single, U.S. Part 91 Owner Since New Engines on MSP w/ Nacelle Essential & APU on MSP 10 Passengers w/ Belted Lav and 3-Place Divan GoGo AVANCE L5 WiFi ProLine 21 Advanced, FANS 1/A, CPDLC Equipped
Modifications
LPV via FMS-5000 WAAS FANS 1/A CPDLC Information Management System Artex ELT w/ Nav interface Control Wheel Lighted Chart Holders Service Panel Lighting Lufthansa Technik NICE Cabin Management System Lightning Detection System
Avionics
Collins ProLine 21 Advanced Avionics Suite
How this aircraft compares
Where this BOMBARDIER CHALLENGER 300 lands versus other BOMBARDIER CHALLENGER 300 listings on fyiAero.
Airframe time
59th pct5,963 hours total (TTAF) · 59th percentile of 17 listings
Engine time (Engine 1)
54th pct5,756 hours since new · 54th percentile of 13 listings
Engine time (Engine 2)
54th pct5,963 hours since new · 54th percentile of 13 listings
Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.
General
| Year | 2011 |
|---|---|
| Manufacturer | BOMBARDIER |
| Model | CHALLENGER 300 |
| Serial Number | 20305 |
| Condition | Used |
Airframe
| Total Time | 5,963 |
|---|---|
| Total Landings | 3,792 |
| Maintenance Tracking | CAMP |
Engine 1
| Engine 1 Serial Number | P118747 |
|---|---|
| Engine 1 Time | 5,756 SNEW |
| Engine 1 Cycles | 3,593 |
Engine 2
| Engine 2 Serial Number | P118748 |
|---|---|
| Engine 2 Time | 5,963 SNEW |
| Engine 2 Cycles | 3,792 |
Avionics
| Avionics/Radios | Collins ProLine 21 Advanced Avionics Suite |
|---|
Additional Equipment
| Additional Equipment | LPV via FMS-5000 WAAS FANS 1/A CPDLC Information Management System Artex ELT w/ Nav interface Control Wheel Lighted Chart Holders Service Panel Lighting Lufthansa Technik NICE Cabin Management System Lightning Detection System |
|---|
Inspection Status
| Inspection Status | 48 Month Inspection Due Apr 2027 96 Month Inspection Due Mar 2027 192 Month Inspection Due Mar 2027 |
|---|
Auxiliary Power Unit
| APU | Yes |
|---|---|
| APU Time | 5,791 |
| APU Maintenance Program | MSP |
Engine Program
| Engine Maintenance Program | MSP |
|---|