2017 BOMBARDIER GLOBAL 6000
Starts from the median asking price of 7 comparable BOMBARDIER Multi-Engine Piston listings ($7,500,000), then adjusts for:
- Year +16 vs comparable listings +20.0%
- Airframe time -5,475 hr vs comps +10.9%
- Engine time -5,475 hr vs comps +12.0%
Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.
Overview
| Make / Model | BOMBARDIER GLOBAL 6000 |
|---|---|
| Type | Multi-Engine Piston |
| Airframe time | 1,946 hrs |
| Engine time | 1,946 SNEW |
| Annual | January 2023 |
Description
Fully Enrolled on Programs 15 Passenger Configuration
Modifications
CONNECTIVITY Swift Broadband Internet
Avionics
The Bombardier Global 6000 is equipped with an integrated, Rockwell Collins Pro Line Fusion avionics suite.
How this aircraft compares
Where this BOMBARDIER GLOBAL 6000 lands versus other BOMBARDIER GLOBAL 6000 listings on fyiAero.
Airframe time
31st pct1,946 hours total (TTAF) · 31st percentile of 13 listings
Engine time (Engine 1)
20th pct1,946 hours since new · 20th percentile of 10 listings
Engine time (Engine 2)
27th pct1,946 hours since new · 27th percentile of 11 listings
Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.
General
| Year | 2017 |
|---|---|
| Manufacturer | BOMBARDIER |
| Model | GLOBAL 6000 |
| Serial Number | 9793 |
| Condition | Used |
Airframe
| Total Time | 1,946 |
|---|---|
| Total Landings | 712 |
Engine 1
| Engine 1 Serial Number | 22717 |
|---|---|
| Engine 1 Time | 1,946 SNEW |
| Engine 1 Cycles | 718 |
Engine 2
| Engine 2 Serial Number | 22716 |
|---|---|
| Engine 2 Time | 1,946 SNEW |
| Engine 2 Cycles | 718 |
Avionics
| Avionics/Radios | The Bombardier Global 6000 is equipped with an integrated, Rockwell Collins Pro Line Fusion avionics suite. |
|---|
Additional Equipment
| Additional Equipment | CONNECTIVITY Swift Broadband Internet |
|---|
Inspection Status
| Inspection Status | Inspection Last Performed Next Due 60 Month January 2023 December 2027 120 Month - December 2027 180 Month - December 2032 240 Month - December 2037 |
|---|
Auxiliary Power Unit
| APU | Yes |
|---|
Engine Program
| Engine Maintenance Program | CorporateCare Enhanced |
|---|