2010 BOMBARDIER CHALLENGER 300
Starts from the median asking price of 4 comparable BOMBARDIER CHALLENGER 300 listings ($9,622,500), then adjusts for:
- Year +3 vs comparable listings +5.2%
- Airframe time -321 hr vs comps +0.6%
Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.
Overview
| Make / Model | BOMBARDIER CHALLENGER 300 |
|---|---|
| Type | Other |
| Airframe time | 5,557 hrs |
| ADS-B | Yes |
| Annual | February 2026 |
Description
Fresh 192 month inspection! Technically as well as well cosmetically in an excellent condition ProLine Advance Avionics FANS 1/A; CPDLC and ADSB out Cabin partially refurbished in 2021 with new Taiping carpet
Modifications
FANS 1A+, CPDLC, ADS-C, Flitephone All ADs & SBs complied Aways operated with an Austrian operator Over Water Kit
Avionics
Challenger 300 Standard Avionics Suite Rockwell Collins ProLine 21 Advanced for all EFIS 10“x12“ LCD Screens presenting Pilot and Co-Pilot PFD, MFD and integrated EICAS functions
How this aircraft compares
Where this BOMBARDIER CHALLENGER 300 lands versus other BOMBARDIER CHALLENGER 300 listings on fyiAero.
Airframe time
53rd pct5,557 hours total (TTAF) · 53rd percentile of 17 listings
Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.
General
| Year | 2010 |
|---|---|
| Manufacturer | BOMBARDIER |
| Model | CHALLENGER 300 |
| Serial Number | 20274 |
| Registration # | OE-HCA |
| Condition | Used |
Airframe
| Total Time | 5,557 |
|---|---|
| Total Landings | 4,983 |
| Winglets | Yes |
Avionics
| ADS-B Equipped | Yes |
|---|---|
| FANS | Yes |
| CPDLC | Yes |
| Avionics/Radios | Challenger 300 Standard Avionics Suite Rockwell Collins ProLine 21 Advanced for all EFIS 10“x12“ LCD Screens presenting Pilot and Co-Pilot PFD, MFD and integrated EICAS functions |
Additional Equipment
| Additional Equipment | FANS 1A+, CPDLC, ADS-C, Flitephone All ADs & SBs complied Aways operated with an Austrian operator Over Water Kit |
|---|
Exterior
| Year Painted | 2018 |
|---|
Inspection Status
| Inspection Status | Fresh 192 month inspection done in Biggin Hill, February 2026 |
|---|
Auxiliary Power Unit
| APU | Yes |
|---|---|
| APU Time | 2,870 |
| APU Maintenance Program | MSP Gold |
Engine Program
| Engine Maintenance Program | MSP Gold |
|---|