Aircraft Inspection Programs

Where the “steps” for an annual or phase inspection legally come from, per aircraft type — the manufacturer's checklist, the regulatory overlay that wraps around it, and the subscription data you work from.

Where the steps legally come from

Use a checklist 14 CFR 43.15(c)

The person performing an inspection must use a checklist while doing it.

Minimum scope 14 CFR 43 Appendix D

Defines the minimum scope of an annual/100-hour inspection — the generic skeleton: cabin/cockpit, engine and nacelle, landing gear, wing and center section, empennage, propeller, radio/avionics, and each installed miscellaneous item. Your checklist can be your own, but it must at least cover Appendix D.

What everyone actually uses Manufacturer inspection checklist

In practice shops work from the manufacturer's inspection checklist, which meets Appendix D and adds all of the type-specific items.

Two regulatory flavors

Annual / 100-hour 14 CFR 91.409(a)

Small piston airplanes get a true annual (and a 100-hour if operated for hire), worked against the manufacturer's annual checklist.

Selected inspection program 14 CFR 91.409(e)

Turbojets, turbo-propeller multi-engine, and large airplanes cannot use a plain annual — the operator must select an approved inspection program (manufacturer program, an approved aircraft inspection program, or a continuous-airworthiness program) and inspect on that schedule.

By type

TypeClassInspectionChecklist sourceSubscription
Piper PA-46
Malibu / Mirage / M350
Pressurized piston single Annual Piper Maintenance Manual, Chapter 5 “Time Limits / Maintenance Checks” Piper / ATP (subscription)
Beechcraft Baron B55
55-series
Piston twin Annual Beech 55-series shop manual + Beechcraft inspection guide / forms Textron Aviation 1View (subscription)
Beechcraft King Air 90 / 200
C90 / B200 families
Turboprop twin Program / phases Beech Phase Inspection cards (Phases 1–4, ~200-hour cycles), MM Chapter 5 Textron Aviation 1View (subscription)
Embraer Phenom 100
EMB-500
Light jet (turbojet) Program / phases Embraer Maintenance Planning Guide with task cards FlyEmbraer (subscription)
Cessna Citation II
Model 550
Light jet (turbojet) Program / phases Cessna Phase 1–5 inspection documents, MM Chapter 5 Textron Aviation 1View (subscription)

The regulatory overlay

A real annual or phase wraps the manufacturer checklist together with these — the checklist alone does not cover them.

ItemBasis / interval
Airworthiness DirectivesAD compliance reviewReview the full AD list for the airframe, engine, propeller and appliances and confirm each recurring AD is current.
ELT91.207(d) — every 12 calendar monthsInspect the emergency locator transmitter for mounting, battery corrosion, signal and battery life.
Transponder91.413 — every 24 calendar monthsTransponder test and inspection required to use it.
Pitot-static / altimeter91.411 — every 24 calendar months (IFR)Static system, altimeter and automatic altitude reporting test for IFR flight.
Life-limited partsper the TCDS / manufacturerTrack and retire life-limited components at their published limits.
STC ICAsInstructions for Continued AirworthinessFold in the ICAs from every STC installed on the airframe — each can add its own inspection tasks and intervals.

Data sources & subscriptions

Reference summary only. Always work an inspection from current, subscribed manufacturer data and verify the regulatory citations against the current 14 CFR; intervals and program elections can change and are subject to the specific aircraft's TCDS, STCs and operating rule.