2015 BOMBARDIER CHALLENGER 350
Starts from the median asking price of 1721 comparable Other listings ($60,000), then adjusts for:
- Year +15 vs comparable listings +20.0%
- Airframe time +1,794 hr vs comps -3.6%
Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.
Overview
| Make / Model | BOMBARDIER CHALLENGER 350 |
|---|---|
| Type | Other |
| Airframe time | 3,484 hrs |
Description
Will be delivered with fresh engines! Engines and APU recently enrolled on MSP Gold! EASA certified 9 - 10 Passenger Configuration FANS 1A +
Modifications
SELCAL System 3rd VHF Communication system for voice/data Datalink with SELCAL option Recorder Independent Power Supply (RIPS) to CVR Datalink compliant with Link 2000+ FANS 1/A+ SATCOM Stick Pusher Quick Disconnect Inhibit option FDR System Landing Pulse Lights Logo Lights 2nd LED navigation lights 2nd ADF option 3D Navigational Map option Lower TSS directional antenna option Smartrunway and Smartlanding option RNP AR 0.3 option ADS-B Out V2 Capability 2nd File Server Unit option Universal Weather on MFD option Enhanced MAP Overlays option
Avionics
Collins ProLine 21 Advanced System: Dual Collins FGC-3002 Flight Guidance Computer Dual Collins ADC-3000 Air Data Computer Dual Collins FMC-6200 Flight Management System Dual Collins DCU-5000 Data Concentration unit Dual Honeywell IR-600 Inertial Reference System Four EFIS AFD-5220E Adaptive Flight Displays (Collins) Collins MDC-4110 Maintenance Diagnostic Computer Collins RTA-4114 Multiscan Weather Radar System Collins ALT-4000 Radio Altimeter Dual Collins HF-9031A HF Communications System Collins DBU-5010E Database Loading Unit Dual Collins VHF-4000 VHF Communication System Dual Collins DME-4000 Distance Measuring Equipment Dual Collins TDR-94D Mode S Transponders Collins RIU-4000 & RIU-4100 Radio Interface Units RVSM 8.33 Spacing
How this aircraft compares
Where this BOMBARDIER CHALLENGER 350 lands versus other BOMBARDIER CHALLENGER 350 listings on fyiAero.
Airframe time
90th pct3,484 hours total (TTAF) · 90th percentile of 10 listings
Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.
General
| Year | 2015 |
|---|---|
| Manufacturer | BOMBARDIER |
| Model | CHALLENGER 350 |
| Serial Number | 20525 |
| Registration # | OE-HUG |
| Condition | Used |
Airframe
| Total Time | 3,484 |
|---|---|
| Total Landings | 1,882 |
Avionics
| Avionics/Radios | Collins ProLine 21 Advanced System: Dual Collins FGC-3002 Flight Guidance Computer Dual Collins ADC-3000 Air Data Computer Dual Collins FMC-6200 Flight Management System Dual Collins DCU-5000 Data Concentration unit Dual Honeywell IR-600 Inertial Reference System Four EFIS AFD-5220E Adaptive Flight Displays (Collins) Collins MDC-4110 Maintenance Diagnostic Computer Collins RTA-4114 Multiscan Weather Radar System Collins ALT-4000 Radio Altimeter Dual Collins HF-9031A HF Communications System Collins DBU-5010E Database Loading Unit Dual Collins VHF-4000 VHF Communication System Dual Collins DME-4000 Distance Measuring Equipment Dual Collins TDR-94D Mode S Transponders Collins RIU-4000 & RIU-4100 Radio Interface Units RVSM 8.33 Spacing |
|---|
Additional Equipment
| Additional Equipment | SELCAL System 3rd VHF Communication system for voice/data Datalink with SELCAL option Recorder Independent Power Supply (RIPS) to CVR Datalink compliant with Link 2000+ FANS 1/A+ SATCOM Stick Pusher Quick Disconnect Inhibit option FDR System Landing Pulse Lights Logo Lights 2nd LED navigation lights 2nd ADF option 3D Navigational Map option Lower TSS directional antenna option Smartrunway and Smartlanding option RNP AR 0.3 option ADS-B Out V2 Capability 2nd File Server Unit option Universal Weather on MFD option Enhanced MAP Overlays option |
|---|
Interior
| Galley | Yes |
|---|---|
| Galley Configuration | Forward |
Auxiliary Power Unit
| APU Maintenance Program | MSP Gold |
|---|
Engine Program
| Engine Maintenance Program | MSP Gold |
|---|