2005 DASSAULT FALCON 2000LX
Starts from the median asking price of 18 comparable DASSAULT Multi-Engine Piston listings ($13,200,000), then adjusts for:
- Year -4 vs comparable listings -6.0%
- Airframe time -313 hr vs comps +0.6%
- Engine time -73 hr vs comps +0.2%
Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.
Overview
| Make / Model | DASSAULT FALCON 2000LX |
|---|---|
| Type | Multi-Engine Piston |
| Airframe time | 5,348 hrs |
| Engine time | 5,231 SNEW |
| Annual | April 2023 |
Description
Entry Into Service Date May 2005 Current Location Englewood, CO Certification Currently Operated – FAR Part 91 Program Coverage FalconCare Elite
Modifications
FANS 1/A CPDLC WAAS / LPV FDR / CVR TCAS II
Avionics
The Dassault Falcon 2000LX is equipped with an integrated, Honeywell EASY II Flight Deck.
How this aircraft compares
Where this DASSAULT FALCON 2000LX lands versus other DASSAULT FALCON 2000LX listings on fyiAero.
Airframe time
50th pct5,348 hours total (TTAF) · 50th percentile of 8 listings
Engine time (Engine 1)
60th pct5,231 hours since new · 60th percentile of 5 listings
Engine time (Engine 2)
40th pct4,975 hours since new · 40th percentile of 5 listings
Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.
General
| Year | 2005 |
|---|---|
| Manufacturer | DASSAULT |
| Model | FALCON 2000LX |
| Serial Number | 51 |
| Condition | Used |
Airframe
| Total Time | 5,348 |
|---|---|
| Total Landings | 2,479 |
Engine 1
| Engine 1 Serial Number | PCE-CF0161 |
|---|---|
| Engine 1 Time | 5,231 SNEW |
| Engine 1 Cycles | 2,435 |
Engine 2
| Engine 2 Serial Number | PCE-CF0121 |
|---|---|
| Engine 2 Time | 4,975 SNEW |
| Engine 2 Cycles | 2,306 |
Avionics
| Avionics/Radios | The Dassault Falcon 2000LX is equipped with an integrated, Honeywell EASY II Flight Deck. |
|---|
Additional Equipment
| Additional Equipment | FANS 1/A CPDLC WAAS / LPV FDR / CVR TCAS II |
|---|
Inspection Status
| Inspection Status | Inspection Last Performed Next Due 1C | 72 Month April 2023 April 2029 2C | 144 Month June 2017 April 2029 |
|---|
Auxiliary Power Unit
| APU | Yes |
|---|
Engine Program
| Engine Maintenance Program | ESP Gold |
|---|