2005 HAWKER 800XP
Starts from the median asking price of 4 comparable HAWKER 800XP listings ($2,072,500), then adjusts for:
- Year +5 vs comparable listings +8.2%
- Airframe time -3,308 hr vs comps +6.6%
- Engine time -794 hr vs comps +2.4%
Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.
Overview
| Make / Model | HAWKER 800XP |
|---|---|
| Type | Multi-Engine Piston |
| Airframe time | 5,449 hrs |
| Engine time | 7,842 SNEW |
| Annual | January 2024 |
Description
Engines Enrolled on MSP APU Enrolled on MSP Flight Data Recorder (88 Parameters) Pro Line 21 Fresh 48 Month Inspection 8 + 1 Passenger Configuration No Damage History
Modifications
Belted Lavatory Flight Data Recorder (88 Parameters) ADS-B Dual FMS Pro Line 21 RVSM
Avionics
The Beechcraft Hawker 800XP is equipped with an integrated, Rockwell Collins Pro Line 21 avionics suite.
How this aircraft compares
Where this HAWKER 800XP lands versus other HAWKER 800XP listings on fyiAero.
Airframe time
14th pct5,449 hours total (TTAF) · 14th percentile of 21 listings
Engine time (Engine 1)
35th pct7,842 hours since new · 35th percentile of 20 listings
Engine time (Engine 2)
57th pct7,842 hours since new · 57th percentile of 21 listings
Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.
General
| Year | 2005 |
|---|---|
| Manufacturer | HAWKER |
| Model | 800XP |
| Serial Number | 258722 |
| Condition | Used |
Airframe
| Total Time | 5,449 |
|---|---|
| Total Landings | 5,184 |
Engine 1
| Engine 1 Time | 7,842 SNEW |
|---|---|
| Engine 1 Cycles | 4.55 |
Engine 2
| Engine 2 Time | 7,842 SNEW |
|---|---|
| Engine 2 Cycles | 5,474 |
Avionics
| Avionics/Radios | The Beechcraft Hawker 800XP is equipped with an integrated, Rockwell Collins Pro Line 21 avionics suite. |
|---|
Additional Equipment
| Additional Equipment | Belted Lavatory Flight Data Recorder (88 Parameters) ADS-B Dual FMS Pro Line 21 RVSM |
|---|
Inspection Status
| Inspection Status | Inspection Last Performed Next Due 24 Month January 2024 January 2026 48 Month June 2025 June 2029 Landing Gear Overhaul May 2017 May 2029 / 8,275 Cycles |
|---|
Auxiliary Power Unit
| APU | Yes |
|---|
Engine Program
| Engine Maintenance Program | MSP |
|---|