2006 HAWKER 800XP
Starts from the median asking price of 4 comparable HAWKER 800XP listings ($2,072,500), then adjusts for:
- Year +6 vs comparable listings +9.8%
- Airframe time -1,972 hr vs comps +3.9%
- Engine time -3,674 hr vs comps +11.0%
Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.
Overview
| Make / Model | HAWKER 800XP |
|---|---|
| Type | Multi-Engine Piston |
| Airframe time | 6,785 hrs |
| Engine time | 4,962 SNEW |
| Annual | April 2025 |
Description
Engines Enrolled on MSP APU Enrolled on MSP Flight Data Recorder (88 Parameters) Pro Line 21 6 + 1 Passenger Configuration No Damage History
Modifications
Belted Lavatory Flight Data Recorder (88 Parameters) Pro Line 21 Dual FMS ADS-B RVSM
Avionics
The Beechcraft Hawker 800XP is equipped with an integrated, Rockwell Collins Pro Line 21 avionics suite.
How this aircraft compares
Where this HAWKER 800XP lands versus other HAWKER 800XP listings on fyiAero.
Airframe time
33rd pct6,785 hours total (TTAF) · 33rd percentile of 21 listings
Engine time (Engine 1)
10th pct4,962 hours since new · 10th percentile of 20 listings
Engine time (Engine 2)
24th pct5,065 hours since new · 24th percentile of 21 listings
Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.
General
| Year | 2006 |
|---|---|
| Manufacturer | HAWKER |
| Model | 800XP |
| Serial Number | 258770 |
| Condition | Used |
Airframe
| Total Time | 6,785 |
|---|---|
| Total Landings | 4,809 |
Engine 1
| Engine 1 Time | 4,962 SNEW |
|---|---|
| Engine 1 Cycles | 4,795 |
Engine 2
| Engine 2 Time | 5,065 SNEW |
|---|---|
| Engine 2 Cycles | 4,883 |
Avionics
| Avionics/Radios | The Beechcraft Hawker 800XP is equipped with an integrated, Rockwell Collins Pro Line 21 avionics suite. |
|---|
Additional Equipment
| Additional Equipment | Belted Lavatory Flight Data Recorder (88 Parameters) Pro Line 21 Dual FMS ADS-B RVSM |
|---|
Inspection Status
| Inspection Status | Inspection Last Performed Next Due 12 Month April 2025 April 2026 24 Month September 2024 September 2026 48 Month September 2022 September 2026 Landing Gear Overhaul October 2014 October 2026 / 6,932 Cycles |
|---|
Auxiliary Power Unit
| APU | Yes |
|---|
Engine Program
| Engine Maintenance Program | MSP |
|---|