2006 HAWKER 800XP
Starts from the median asking price of 4 comparable HAWKER 800XP listings ($2,072,500), then adjusts for:
- Year +6 vs comparable listings +9.8%
- Airframe time -242 hr vs comps +0.5%
- Engine time +1,987 hr vs comps -6.0%
Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.
Overview
| Make / Model | HAWKER 800XP |
|---|---|
| Type | Multi-Engine Piston |
| Airframe time | 8,515 hrs |
| Engine time | 10,623 |
| Annual | December 2024 |
Description
Engines Enrolled on MSP APU Enrolled on MSP Pro Line 21 Flight Data Recorder (88 Parameters) 6+1 Passenger Configuration No Damage History
Modifications
Pro Line 21 Flight Data Recorder (88 Parameters) ADS-B RVSM Dual FMS Belted Lavatory
Avionics
The Beechcraft Hawker 800XP is equipped with an integrated, Rockwell Collins Pro Line 21 avionics suite.
How this aircraft compares
Where this HAWKER 800XP lands versus other HAWKER 800XP listings on fyiAero.
Airframe time
57th pct8,515 hours total (TTAF) · 57th percentile of 21 listings
Engine time (Engine 1)
95th pct10,623 engine hours · 95th percentile of 20 listings
Engine time (Engine 2)
38th pct5,748 engine hours · 38th percentile of 21 listings
Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.
General
| Year | 2006 |
|---|---|
| Manufacturer | HAWKER |
| Model | 800XP |
| Serial Number | 258786 |
| Condition | Used |
Airframe
| Total Time | 8,515 |
|---|---|
| Total Landings | 6,228 |
Engine 1
| Engine 1 Time | 10,623 |
|---|---|
| Engine 1 Cycles | 7,041 |
Engine 2
| Engine 2 Time | 5,748 |
|---|---|
| Engine 2 Cycles | 4,279 |
Avionics
| Avionics/Radios | The Beechcraft Hawker 800XP is equipped with an integrated, Rockwell Collins Pro Line 21 avionics suite. |
|---|
Additional Equipment
| Additional Equipment | Pro Line 21 Flight Data Recorder (88 Parameters) ADS-B RVSM Dual FMS Belted Lavatory |
|---|
Inspection Status
| Inspection Status | Inspection Last Performed Next Due 48 Month December 2024 December 2028 Landing Gear Overhaul May 2016 April 2028 / 9,991 Cycles |
|---|
Auxiliary Power Unit
| APU | Yes |
|---|
Engine Program
| Engine Maintenance Program | MSP |
|---|