‹ Back to results
Multi-Engine Piston

2008 GULFSTREAM G150

Call for price fyiEstimate $6,165,000–$6,321,000 How this estimate is built

Starts from the median asking price of 22 comparable GULFSTREAM Multi-Engine Piston listings ($5,197,500), then adjusts for:

  • Year +4 vs comparable listings +6.0%
  • Airframe time -3,399 hr vs comps +6.8%
  • Engine time -2,033 hr vs comps +6.1%

Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.

2008
3,428 hrs
0265
2
📍 Morrisville, North Carolina

Overview

Make / ModelGULFSTREAM G150
TypeMulti-Engine Piston
Airframe time3,428 hrs
Engine time3,428 SNEW
AnnualNov 2023

Description

Fully Enrolled on Programs Fresh MPI and 16C (192 months Inspection) Electronic Charts Datalink 8 Passenger Configuration

Modifications

ADS-B Out Jeppesen Electronic Charts Arinc Direct Datalink Collins DBU-4100

Avionics

The Gulfstream G150 is equipped with an integrated Collins Proline 21 avionics suite.

How this aircraft compares

Where this GULFSTREAM G150 lands versus other GULFSTREAM G150 listings on fyiAero.

Airframe time

54th pct
1,7119,471This aircraft · 3,428

3,428 hours total (TTAF) · 54th percentile of 13 listings

Engine time (Engine 1)

46th pct
1,71132,022This aircraft · 3,428

3,428 hours since new · 46th percentile of 13 listings

Engine time (Engine 2)

46th pct
1,71132,022This aircraft · 3,428

3,428 hours since new · 46th percentile of 13 listings

Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.

General

Year2008
ManufacturerGULFSTREAM
ModelG150
Serial Number0265
ConditionUsed

Airframe

Total Time3,428
Total Landings2,410
Maintenance TrackingCAMP

Engine 1

Engine 1 Serial NumberP-126225
Engine 1 Time3,428 SNEW
Engine 1 Cycles2,410

Engine 2

Engine 2 Serial NumberP-126224
Engine 2 Time3,428 SNEW
Engine 2 Cycles2,410

Avionics

Avionics/RadiosThe Gulfstream G150 is equipped with an integrated Collins Proline 21 avionics suite.

Additional Equipment

Additional EquipmentADS-B Out Jeppesen Electronic Charts Arinc Direct Datalink Collins DBU-4100

Inspection Status

Inspection StatusInspection Last Performed Next Due 24 Month Nov 2023 Nov 2025 48 Month March 2021 Nov 2025 96 Month Sept 2024 Sept 2032 192 Month Dec 2024 Dec 2036

Auxiliary Power Unit

APUYes

Engine Program

Engine Maintenance ProgramMSP