‹ Back to results
Multi-Engine Piston

2013 GULFSTREAM G650ER

🕒 Listed 4 weeks ago
Call for price
fyiEstimate $37,882,000–$38,841,500 ⓘ How this estimate is built

Starts from the median asking price of 5 comparable Gulfstream G650ER listings ($45,950,000), then adjusts for:

  • Year -3 vs comparable listings -4.5%
  • Airframe time +1,052 hr vs comps -2.1%
  • Engine time +1,014 hr vs comps -14.2%
  • Autopilot (0% of comps) +3.0%
  • ADS-B (60% of comps) +1.0%

Shown as a range. An estimate from asking-price comparables and FAA supply data — not an appraisal.

2013
3,241 hrs
N801KF ✈ Flight Tracking
Oct 19, 2026 (24 hours ago)
6044
ROLLS ROYCE BR725
2
—
—
★ 5.0 (5 Google reviews)
Tvpx Aircraft Solutions INC Trustee Corporation
Per the FAA aircraft registry (public record)

Overview

Make / ModelGulfstream G650ER
TypeMulti-Engine Piston
Airframe time3,241 hrs
Engine time3,166 SNEW
Avionics / Weather radarRDR-4000
Avionics / Terrain / EGPWSEGPWS
Avionics / Traffic (TCAS / TAS)TCAS II
Autopilot ADS-B

Description

Gulfstream ARCS Inspection Reserved – Oct 19 @ St. Louis • Outstanding U.S. Pedigree • Low Hours & Cycles • Starlink & KA Band Dual Connectivity • Full Block 3 Upgrade • 12C (144 Month) Aug 2025 by Gulfstream-SAV • Preferred Forward Galley + Crew Rest Configured • 14 Passenger Layout with Aft Stateroom • Upgraded 88 Parameter FDR • Engines on Rolls Royce Corporate Care • APU on Honeywell MSP Gold • Honeywell MSP Mechanical & Collins CASP

Modifications

Connectivity Starlink (New 2025) w/ GCMS Hub Integration KA Band Satcom (New 2021) Satcom Direct Router (SDR) (New 2025) Honeywell MCS-7120 Satellite Communication Swift Broadband High Speed Data Iridium Aircell Axxess II Satellite Flight Phone w/Two (2) Channels for Voice & Data Entertainment Gulfstream Cabin View System w/iPad App Control Forward & Aft 26” HD LCD Bulkhead Monitors 26” HD LCD Monitor at Credenza Individual 12” HD LCD Monitors 17” HD LCD Monitor in Crew Rest Two (2) HDMI Inputs (Connection to Cabin Entertainment) USB Chargers at Each Seat Galley & Cabin Amenities Gulfstream Cabin Management System (GCMS 1) Aft Cabin Divider Dynamo Galley Refrigerator Enflite Convection Oven Dynamo Aviation Microwave Espresso Coffee Maker Wine Chiller (Mid-Cabin Credenza) Safety of Flight Features Rockwell Collins Head Up Display (HUD II) Enhanced Vision System (EVS II) Synthetic Vision-Primary Flight Display (SV-PFD) Automatic Emergency Descent Mode (AEDM) FANS-1A with CPDLC & ADS-C Wide Area Augmentation System (WAAS) Lateral Precision Vertical (LPV) Approach Capability Enhanced Ground Proximity Warning System with Windshear Runway Awareness Advisory System (RAAS) Predictive Weather Hazards Situational Awareness Package Predictive Landing Performance System (PLPS) TCAS Coupled Autopilot (TCAS AP) Pilot & Copilot Emergency Vision Assurance Systems (EVAS) Maintenance Programs Rolls Royce Corporate Care for Engines Honeywell MSP Gold for APU Honeywell MSP Mechanical Collins CASP Avionics Gulfstream CMP Maintenance Tracking Program Recent Maintenance ARCS Inspection Reserved – October 19 at Gulfstream-St. Louis Major Inspections – August 2025 by Gulfstream-Savannah: 1C (12 Month) 2C (24 Month) 3C (36 Month) 4C (48 Month) 6C (72 Month) 12C (144 Month) 1C (12 Month) Inspection – May 2026 by Gulfstream-Westfield New Multi-Function Probes (#1, #3, & #4) – May 2026 by Gulfstream-Westfield Block 3 Upgrades – All Options June 2024 by Gulfstream-Savannah ASC 100A Planeview Avionics Enhancement ASC 903A Master Operating System Update ASC 120 Predictive Weather Hazards ASC 121 Situational Awareness Package ASC 127 Predictive Landing Performance System (PLPS) ASC 128 TCAS Coupled Autopilot (TCAS AP) Additional ASC Compliance ASC 005 Runway Awareness and Advisory System (RAAS) ASC 027 Max Takeoff Weight Reduction to 90,000 lbs. ASC 030 Max Zero Fuel Weight Reduction to 60,000 lbs. ASC 055 Auto Brakes ASC 125 HUD II Update ASC 139 Emergency Vision Assurance System – Pilot & Copilot (April 2026) ASC 140 Aircraft Health and Trend Monitoring System (AHTMS) Software Update

Avionics

Gulfstream PlaneView™ II / Honeywell Primus Epic Flight Deck Four Honeywell 14” Adaptive LCD Displays Fly-By-Wire System w/Five (5) Channel Redundancy Rockwell Collins Head Up Display (HUD II) Gulfstream Enhanced Vision System II (EVS II) Honeywell SmartView™ Synthetic Vision-Primary Flight Display (SV-PFD) Dual Pitch/Roll Autopilot w/FADEC Interfaced Auto Throttle System Automatic Emergency Descent Mode (AEDM) Triple Digital Audio Control Panels Triple Honeywell VHF Navigation Systems Triple Honeywell VHF Communication Systems Dual Honeywell Mode S Enhanced Transponders Dual Honeywell DM-855 DMEs Honeywell DF-855 ADF Dual Honeywell KRA-405B Radio Altimeters Air Data Computers w/Four (4) Multifunction Probes Triple Honeywell NextGen Flight Management Systems (FMS) Triple Honeywell LASEREF VI Inertial Reference Systems (IRS) Dual Honeywell Mark V EGPWS w/RAAS & Windshear Dual GPS w/WAAS-LPV FANS-1A w/CPDLC & ADS-C ADS-B Out (DO-260B) Dual VDL Mode A and Mode 2 HFs w/SECAL Honeywell TCAS II w/Change 7.1 PlaneView II XM WX Weather - Continental US Coverage Honeywell RDR-4000 3-D Weather Radar Honeywell Solid State Cockpit Voice Recorder Digital Flight Data Recorder (88 Parameters) 406 MHz ELT w/Nav Interface

Recommended avionics upgrades

Garmin GTN 650Xi

No IFR GPS navigator is listed — a GTN 650Xi is the standard entry point for WAAS/LPV capability.

See prices & suppliers ›

Suggestions are based on the panel described in this listing; verify STC approval for this make/model before any installation.

Service Difficulty Reports (SDRs)

Checking FAA service difficulty reports…

Airworthiness Directives (ADs)

Checking airworthiness directives…

How this aircraft compares

Where this Gulfstream G650ER lands versus other Gulfstream G650ER listings on fyiAero.

Price

$45.8M$47.9M

median $46.0M of 5 comparable asking prices

Airframe time

69th pct
1,0005,326This aircraft · 3,241

3,241 hours total (TTAF) · 69th percentile of 16 listings

Engine time (Engine 1)

54th pct
1,0335,329This aircraft · 3,166

3,166 hours since new · 54th percentile of 13 listings

Engine time (Engine 2)

62nd pct
1,0335,326This aircraft · 3,241

3,241 engine hours · 62nd percentile of 13 listings

Percentile = share of comparable listings at or below this value. Lower airframe/engine hours are generally fresher; price reflects the asking price only.

General

Year2013
ManufacturerGULFSTREAM
ModelG650ER
Serial Number6044
Registration #N801KF
ConditionUsed

Airframe

Total Time3,241
Total Landings1,223

Engine 1

Engine 1 Make/ModelROLLS ROYCE BR725
Engine 1 Time3,166 SNEW
Engine 1 Cycles1,189

Engine 2

Engine 2 Make/ModelROLLS ROYCE BR725
Engine 2 Time3,241
Engine 2 Cycles1,223

Avionics

Avionics/RadiosGulfstream PlaneView™ II / Honeywell Primus Epic Flight Deck Four Honeywell 14” Adaptive LCD Displays Fly-By-Wire System w/Five (5) Channel Redundancy Rockwell Collins Head Up Display (HUD II) Gulfstream Enhanced Vision System II (EVS II) Honeywell SmartView™ Synthetic Vision-Primary Flight Display (SV-PFD) Dual Pitch/Roll Autopilot w/FADEC Interfaced Auto Throttle System Automatic Emergency Descent Mode (AEDM) Triple Digital Audio Control Panels Triple Honeywell VHF Navigation Systems Triple Honeywell VHF Communication Systems Dual Honeywell Mode S Enhanced Transponders Dual Honeywell DM-855 DMEs Honeywell DF-855 ADF Dual Honeywell KRA-405B Radio Altimeters Air Data Computers w/Four (4) Multifunction Probes Triple Honeywell NextGen Flight Management Systems (FMS) Triple Honeywell LASEREF VI Inertial Reference Systems (IRS) Dual Honeywell Mark V EGPWS w/RAAS & Windshear Dual GPS w/WAAS-LPV FANS-1A w/CPDLC & ADS-C ADS-B Out (DO-260B) Dual VDL Mode A and Mode 2 HFs w/SECAL Honeywell TCAS II w/Change 7.1 PlaneView II XM WX Weather - Continental US Coverage Honeywell RDR-4000 3-D Weather Radar Honeywell Solid State Cockpit Voice Recorder Digital Flight Data Recorder (88 Parameters) 406 MHz ELT w/Nav Interface

Additional Equipment

Additional EquipmentConnectivity Starlink (New 2025) w/ GCMS Hub Integration KA Band Satcom (New 2021) Satcom Direct Router (SDR) (New 2025) Honeywell MCS-7120 Satellite Communication Swift Broadband High Speed Data Iridium Aircell Axxess II Satellite Flight Phone w/Two (2) Channels for Voice & Data Entertainment Gulfstream Cabin View System w/iPad App Control Forward & Aft 26” HD LCD Bulkhead Monitors 26” HD LCD Monitor at Credenza Individual 12” HD LCD Monitors 17” HD LCD Monitor in Crew Rest Two (2) HDMI Inputs (Connection to Cabin Entertainment) USB Chargers at Each Seat Galley & Cabin Amenities Gulfstream Cabin Management System (GCMS 1) Aft Cabin Divider Dynamo Galley Refrigerator Enflite Convection Oven Dynamo Aviation Microwave Espresso Coffee Maker Wine Chiller (Mid-Cabin Credenza) Safety of Flight Features Rockwell Collins Head Up Display (HUD II) Enhanced Vision System (EVS II) Synthetic Vision-Primary Flight Display (SV-PFD) Automatic Emergency Descent Mode (AEDM) FANS-1A with CPDLC & ADS-C Wide Area Augmentation System (WAAS) Lateral Precision Vertical (LPV) Approach Capability Enhanced Ground Proximity Warning System with Windshear Runway Awareness Advisory System (RAAS) Predictive Weather Hazards Situational Awareness Package Predictive Landing Performance System (PLPS) TCAS Coupled Autopilot (TCAS AP) Pilot & Copilot Emergency Vision Assurance Systems (EVAS) Maintenance Programs Rolls Royce Corporate Care for Engines Honeywell MSP Gold for APU Honeywell MSP Mechanical Collins CASP Avionics Gulfstream CMP Maintenance Tracking Program Recent Maintenance ARCS Inspection Reserved – October 19 at Gulfstream-St. Louis Major Inspections – August 2025 by Gulfstream-Savannah: 1C (12 Month) 2C (24 Month) 3C (36 Month) 4C (48 Month) 6C (72 Month) 12C (144 Month) 1C (12 Month) Inspection – May 2026 by Gulfstream-Westfield New Multi-Function Probes (#1, #3, & #4) – May 2026 by Gulfstream-Westfield Block 3 Upgrades – All Options June 2024 by Gulfstream-Savannah ASC 100A Planeview Avionics Enhancement ASC 903A Master Operating System Update ASC 120 Predictive Weather Hazards ASC 121 Situational Awareness Package ASC 127 Predictive Landing Performance System (PLPS) ASC 128 TCAS Coupled Autopilot (TCAS AP) Additional ASC Compliance ASC 005 Runway Awareness and Advisory System (RAAS) ASC 027 Max Takeoff Weight Reduction to 90,000 lbs. ASC 030 Max Zero Fuel Weight Reduction to 60,000 lbs. ASC 055 Auto Brakes ASC 125 HUD II Update ASC 139 Emergency Vision Assurance System – Pilot & Copilot (April 2026) ASC 140 Aircraft Health and Trend Monitoring System (AHTMS) Software Update

Interior

Number of Seats14
Galley ConfigurationForward

Auxiliary Power Unit

APUYes
APU Time2,621
APU Maintenance ProgramMSP Gold

Engine Program

Engine Maintenance ProgramRolls Royce CorporateCare

Operating costs & specifications — Gulfstream G650ER

Typical model-level figures for the Gulfstream G650ER (not this specific airframe).

$3,755,869annual budget · 325 hrs/yr
$8,173variable cost / hour
$16.35cost per nm
490.0gph fuel burn
$45,681,471avg pre-owned asking fyiEstimate  $37,882,000–$38,841,500

Annual cost breakdown

Low useHigh use
Hours / year200325
Fuel$705,600$1,146,600
Fixed$1,099,644$1,099,644
Variable$1,634,600$2,656,225
Total / hour$13,671$11,557

Performance & dimensions

Range7,600 nm
Cruise speed435 kts · 501 mph
Seating2 crew + 18 passengers
Cabin H × W × L6' 3" × 8' 2" × 46' 10"
Interior volume2423 ft³
Takeoff / landing6300 ft / 3200 ft

About this plane

The Gulfstream G650ER has a variable operating cost of $7,392 per hour. It delivers an extraordinary range of 7,000 nautical miles and cruises at a normal speed of 500 knots (575 mph), with an average fuel burn of 490 gallons per hour. The cabin of the Gulfstream G650ER measures 6'3" high, 8'2" wide, and 46'10" long, offering 2,423 cubic feet of interior volume making it one of the largest in its class. Accommodating up to 19 passengers, the G650ER features a flat-floor design, a customizable four-zone layout, 16 panoramic windows, and an advanced cabin air circulation system for unmatched comfort and wellness. Equipped with the cutting-edge Gulfstream PlaneView II avionics suite, the aircraft is designed for nonstop international missions. Requiring 6,300 feet for takeoff and 3,200 feet for landing, the G650ER ensures excellent accessibility to global destinations while maintaining top-tier performance and luxury. Get a Personalized Demo See AviaCost in action with a tailored walkthrough of Gulfstream G650ER's full ownership model — including trip costs, depreciation, and branded PDF reports.

Previous listing for N801KF

Previous listing photo of N801KF

2013 GULFSTREAM G650ER

Airframe
3,241 hrs
Engine
3,166 hrs
View previous listing ↗ · last seen Oct 2026

Range from base

Still-air range ring — type an aircraft to change it. Compare aircraft on the Range tool ›

Last flight

Actual flight path from FlightAware for N801KF. More flight tracking ›