‹ Inspection Programs

Embraer Phenom 100 EMB-500

Light jet (turbojet) · Selected program / phases

Regulatory basis
14 CFR 91.409(e) — an annual does not apply; the operator selects an inspection program
Checklist source
Embraer Maintenance Planning Guide with task cards
How it works
As a turbojet the Phenom uses program selection: the operator almost always adopts Embraer's Maintenance Planning Guide (12-month / 600-hour basic inspections plus calendar items).
Data / subscription
FlyEmbraer (subscription) — also covers

Regulatory overlay (applies to every inspection)

Beyond the manufacturer checklist above, every annual or phase also reconciles:

ItemBasis / interval
Airworthiness DirectivesAD compliance reviewReview the full AD list for the airframe, engine, propeller and appliances and confirm each recurring AD is current.
ELT91.207(d) — every 12 calendar monthsInspect the emergency locator transmitter for mounting, battery corrosion, signal and battery life.
Transponder91.413 — every 24 calendar monthsTransponder test and inspection required to use it.
Pitot-static / altimeter91.411 — every 24 calendar months (IFR)Static system, altimeter and automatic altitude reporting test for IFR flight.
Life-limited partsper the TCDS / manufacturerTrack and retire life-limited components at their published limits.
STC ICAsInstructions for Continued AirworthinessFold in the ICAs from every STC installed on the airframe — each can add its own inspection tasks and intervals.

Reference summary only. Work the inspection from current, subscribed manufacturer data and verify citations against the current 14 CFR and this aircraft's TCDS and STCs.

‹ All inspection programs